Umatilla-Morrow County Connect Project

The Umatilla-Morrow County Connect (UMCC) Project will provide transmission system interconnection between Umatilla and Morrow counties. This interconnection will expand UEC’s 230 kV transmission system to increase reliability and capacity, support economic development and regional growth and provide a transmission path for renewable energy across the region.

About the Project

Interactive Simulations Map


Design Specifications
Features
During Construction
Land Disturbed (approximate)
Completed Structures
Structure Footprint (Base)

Timeline & Approval

The Notice of Intent provided preliminary and general information about the proposed facility. The Oregon Department of Energy and other government agencies use the Notice to identify a facility’s potential effects, required permits and applicable agency requirements. The Notice provided the first opportunity for the public to comment on a project.

UMCC Project Notice of Intent

Umatilla Electric hosted a public informational hearing in Boardman to introduce the Umatilla Morrow County Connect project, including the proposed and alternate routes and design specifications. This hearing included the opportunity for questions and feedback from the community.

The Oregon Department of Energy prepared the Project Order based on the Notice of Intent and comments received from the public, government agencies and tribes. This informed UEC of all statutes, rules and local ordinances that apply to the project, and what UEC needed to address in the Application for Site Certificate.

UMCC Project Order

The application includes 27 exhibits with a detailed description of the site, proposed transmission line, and anticipated impacts. State and local agencies – including the Department of Fish & Wildlife, Department of Transportation, Department of Environmental Quality, tribes and local governments – reports on the sufficiency of the information included in the application as it relates to their requirements and permits.

UMCC Project Site Certificate

Oregon Department of Energy will prepare the Draft Proposed Order after evaluating the application and Energy Siting Council standards. This order includes whether the proposed transmission line complies with the standards and its recommended site certificate conditions for constructing, operating and retiring a facility.

Anyone who wants to participate beyond this point in the process must:

  1. Raise an issue, either in person at the public hearing, or by submitting a written comment to ODOE before the deadline given in the notice.
  2. Specifically describe the issue for EFSC, ODOE and the applicant to respond, and include facts supporting the person’s position on the issue.

Based on comments received and the Energy Facility Siting Council’s direction following a public meeting, the Oregon Department of Energy will issue a Proposed Order. ODOE will also send a Notice of Contested Case to anyone who appeared in person at the public hearing or submitted a written comment before the comment deadline.

The Energy Facility Siting Council evaluates the Proposed Order and decides whether to issue a Final Order. Once EFSC issues the Final Order, anyone who participated in a contested case have 30 days to apply for a rehearing with EFSC and within 60 days petition the Oregon Supreme Court.

* All future dates are estimated and contingent on the EFSC process.

The size of the steel pole structures will vary and be approximately 90 to 120 feet tall and approximately 40 to 50 inches in diameter at their base. These structures will support double circuit 230kV transmission conductor.

100’ to 150’ Right-of-Way (Typ.)
Two-Pole (Deadend)

100’ to 150’ Right-of-Way (Typ.)
Two-Pole (Tangent or Running Angle)

100’ to 150’ Right-of-Way (Typ.)
Monopole

We are committed to our communities and our members who reside in them. UEC is working hard to minimize the impacts while we identify system improvements to keep the affected community informed as the project progresses through construction.