Umatilla-Morrow County Connect Project

The Umatilla-Morrow County Connect (UMCC) Project will provide transmission system interconnection between Umatilla and Morrow counties. This interconnection will expand UEC’s 230 kV transmission system to increase reliability and capacity, support economic development and regional growth and provide a transmission path for renewable energy across the region.

About the Project

Interactive Simulations Map


Design Specifications
Features
During Construction
Land Disturbed (approximate)
Completed Structures
Structure Footprint (Base)

Timeline, Approval & Additional Information

The size of the steel pole structures will vary and be approximately 90 to 120 feet tall and approximately 40 to 50 inches in diameter at their base. These structures will support double circuit 230kV transmission conductor.

100’ to 150’ Right-of-Way (Typ.)
Two-Pole (Deadend)

100’ to 150’ Right-of-Way (Typ.)
Two-Pole (Tangent or Running Angle)

100’ to 150’ Right-of-Way (Typ.)
Monopole

We are committed to our communities and our members who reside in them. UEC is working hard to minimize the impacts while we identify system improvements to keep the affected community informed as the project progresses through construction.